Design and Construct Fuel Station at Kusile Power Station for a period of 7 months
EskomMpumalangaBid(Open-Tender)Construction & building
No compulsory briefing is listed for this tender.
Requirements from the documents
These documents haven't been summarised yet. The key dates and documents are on this page; the requirements are in the official tender documents listed alongside.
Key dates
- Closes
- Friday 30 October 2026, 10:00 ()
- Briefing
- Optional, 29 September 2026, 10:00
- Published
- 18 September 2026
- Bid valid for
- 84 days
- Submission
- Electronic, on eTenders
- Tender number
- E3526GXMPKUS
Special conditions
N/A
Official documents
240-12248652_List of Tender Returnables_Cat 2_ Rev 7.pdf240-125815990 - Kusile Commissioning Completion Work Instruction.pdf240-56364545 Structural Design and Engineering Standard.pdfBravo 8.pdfBravo 6.pdfBravo 7.pdf0.90-23539-1-8 WORKSHOP and STORES PORTABLE WATER LAYOUT.tifBravo 29.pdf240-56356396 - Earthing and Lightning Standard.pdf0.90-23542-1-8 WORKSHOP and STORES CLEAN SW LONGSECTIONS 2 OF 3.pdfBravo 12.pdf240-56355754 Field Instrument Installation Standard Field Installation Requirements.pdf240-55714363 Coal-Fired Power Stations Lighting and Small Power Installation Standard.pdf240-57648795 Additional Technical Requirements for Mini-substations Guideline.pdfAddendum - Financial Analysis -CIDB.pdf240-56356491 DC Earth Fault Detection Manual.pdfBravo Final report.zip240-114036246 Occupational Hygiene Health Risk Assessment Work Instruction.pdfAppendix B.doc240-56356510 Definitions of Terms Applicable to DC Emergency Supplies Standard.pdf240-91244751 Specification for Geotechnical Investigations Standard.pdfBravo 5.pdf240-76992014 Technical Documents and Records Management Work Instruction.pdf240-107981296 Constructability Assessment Guideline.pdf240-56355731 Environmental Conditions for Process Control Equipment Used at Power Stations Standard.pdf240-54937454 Inspection Testing and Maintenance of Fire Protection Systems Standard.pdf240-107305502 SmartPlant Data Take-On Standard.pdfVOLUME 2.docC1 2b ECC3 Data by Contractor.pdfAddendum - Additional Supporting Documents.pdf0.90-71685 Site Finishing - Site Plan - Area 17D.pdfBravo 23.pdf203-770 Kusile Conrete Specification.pdf240-56364537 - Design of Steel Structures.pdf240-109607332 Abbreviation Standard for Labelling of Plant at Power Stations.pdfDiesel Facility KUS-20250797 Kusile Power Station Environmental Specification Rev 1_.pdfSupplier Development Localisation Industrialisation (SDLI) Strategy for Bidders.pdf240-56536505 Hazardous Location Standard.pdf240-56536488 Control of Works Performed on Large Power Transformers Standard.pdf240-68099512 Form A_Cat 2_ Rev 9.docx240-54937439 Fire Protection Detection Assessment Standard.pdf240-61227631 Piping and Instrumentation Diagram P and ID Standard.pdfC2 ECC3 Pricing Data Option B.pdf240-106628253 Standard for Welding Requirement on Eskom plant.pdf240-125815990 CommCompletionKPSP-Rev1.pdf240-92460850 Geotechnical Standard for CSY and ADF Site Investigation.pdfAppendix C.doc240-56358900 Sampling and Testing of Mineral Insulating Oil for Power.pdfBravo 19.pdf240-132735850 Kusile Engineering Change Management Procedure.pdf240-56630085 Arrangement Design Guideline.pdf240-56179027 Safety Measures Protective Equipment for Electric Arc.pdf240-54937450 Fire Barrier Seals for Electrical Cable Installations.pdf240-57617975_2 - Procurement of Power Station Low Voltage Motors Specification.pdf240-131750549 Earthing and Lightning Protection Concept.pdf240-105020315 Standard for Low Pressure Valves.pdf240-54937450 Fire Protection and Life Safety Design Standard.pdfAppendix D.docP146838-0UXC-S3336C-R05 Service Air TP.pdf0.90-23545-1-5 WORKSHOP and STORES PLATFORM ROAD PARKING 1 OF 2.tif240-128515850 Documentation Handover Specification.pdfBravo 3.pdf240-56360034 Stationary Vented Lead Acid Batteries.pdfBravo 25.pdfEskom life-saving rules.pdf0.90-23539-2-6 WORKSHOP and STORES FIRE WATER LAYOUT.tifBravo 16.pdf240-56359053 Transformer Hand Conditioning Standard.pdf240-54179170 Technical Documentation Classification and Designation Standard.pdf240-53114248 Thyristor and Switch Mode Charger Converter Inverter Power Supply Standard.pdfC3 1 ECC3 Employers Works Information.pdfKusile Commissioning Completion Procedure.pdf090 24714 (Filling Station) SCHEMATIC DIAGRAM DB-FD.pdfBRAVO KEY TO DESCRIPTORS.doc240-50237155 New MV Motor Procurement Standard.pdfC1 2a ECC3 Data by Employer(1).pdf0.90 1940 Plan_Roof Plan_Sections and Elevations.pdf0.90-137 Station Layout.pdf240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx36-1126 Specification for corrosion protection of plant and equipment with coatings.pdf240-56355789 Flow Measurement Systems Installation Standard.pdfBravo 27.pdfE-tendering Help Manual for supplier - 27 January 2025.docx240-58552870 SmartPlant for Owner Operators (SPO) Documentation Metadata Standard.pdf240-56355815 Field Instrument Installation Standard Junction Boxes and Cable Termination.pdf240-106365693 Standard for the External Corrosion Protection of Plant, Equipment and Associated Piping with Coatings.pdf240-75005287 Electrical CoE Internal Design Review Work Instruction.pdfE-Tenderers E-Tendering Training Acknowledgement Form - 27 January 2025.docx240-83539994 Standard for Non-Destructive Testing NDT on Eskom Plant.pdf240-84418186 Roads Specification Manual.pdfBravo 11.pdf240-109253698 CQP Template- Rev 3.docx240-56360086 Stationary Vented Ni-Cad Batteries.pdfSupplier Quality Management Specification.pdf240-105658000 Supplier QM Spec Rev 3-QM 58 (3).pdf240-56355843 Pressure Measurement Systems Installation Standard.pdfBravo 13.pdf240-49910508 Environmental Analysis Guideline.pdf240-109607736 Eskom KKS Key Part Standard.pdf240-56355466 Alarm Management System Guideline.pdfBravo 4.pdfBravo 30.pdfC0 ECC3 Contract cover page(1).pdfSustainability Systems OHS Operational Plan.pdf240-56361435 Transport of Power Station Electric Motors Standard.pdf240-85549846 Standard for Design of Drainage and Sewerage Infrastructure.pdf240-125171334 Guideline for the Design of Ash Disposal Facilities for Coal Fired Power Stations.pdf240-145581571 - Piping identification and colour coding.pdf366-215862 Kusile Project Specification for Structural Concrete.pdf32-245 Waste Management Standard.pdfBravo GI Report.docCLARIFICATION Number 1 05102026.docx240-56227443 Requirements for Control and Power Cables for Power Station Standard.pdf240-57127955 Geotechnical and Foundation Engineering Standard.pdfBravo 17.pdf240-56178825 Requirements for Transportation and Movement of Large.pdfBravo 28.pdfC4 ECC3 Site Information.pdf240-123801640 Specification for Low Pressure Pipelines Standard.pdfAppendix B.pdf240-86973501 - Engineering Drawing Standard – Common Requirements.pdf240-56356396 Earthing and Lightning Protection Standard.pdf240-57127953 Execution of Site Preparation and earthworks.pdfC1 1 ECC3 Offer Acceptance(1).pdfMASTER DOC.pdf240-56357424 MV and LV Switchgear Protection Standard.pdf240-56227589 List of Approved Electronic Devices to be Used on Eskom Power.pdf240-56355729 - Plant Control Modes Guideline.pdfPlant labelling and coding work instruction.pdfClarification question 12 a.png240-50056004 Constructability Analysis Guideline.pdfBravo 1.pdf240-56227573 Air-Insulated Withdrawable AC Metal-Enclosed Switchgear.pdfBravo 24.pdf0.90-23547-1-7 WORKSHOP and STORES DIRTY STORM WATER LAYOUT.tifBravo 14.pdf240-93576498 KKS Coding Standard.pdf240-56356376 On-Site Commissioning for Low Pressure Systems Standard.pdfAppendix A - Borehole Logs.doc01000 EARTHING AND LIGHTING PROTECTION STADARD GUIDELINE0000.pdfBravo 22.pdf240-68973110 Specification for Power Transformer rated for 1.25MVA a.pdf240-56355541 Control System Computer Equipment Habitat Requirements Guideline.pdfFuel Filling Station Technical Evaluation Strategy22.09.2026.pdfClarification question 5.docxMeteorological Data.pdf240-56227778 Fault Current Calculations Rating Switch-Gear Standard.pdf240-56535950 Electrical Plant Information Files Standard.pdf240-145581571 Specification for the Identification of the Contents of Pipelines and Vessels.pdfBravo 21.pdfTender Validity & Extension Memo-Addendum.pdfBravo 20.pdf0.90_24977_Rev 10.pdfAddenda - Technical Evaluation Criteria 22.09.2026.pdfBravo 10.pdfInvitation to Tender (ITT) - Fuel Filling Station.pdf090 - 24713(Filling Station) LIGHTING, SMALL POWER AND LIGHTNING PROTECTION LAYOUT.pdfBravo 2.pdf240-131806419 Rev 1 Excavating and Trenches work instruction_.pdfCopy of Unpriced BOQ Report for Fuel Station.xlsxFuel Filling Station Scope of Work-latest.pdf240-60238757 On-site Dry Out of Power Transformers Within Generation Standard.pdfBravo 15.pdf0.90-55181 Kusile Power Station Filling Station.pdf240-137465740 Standby Battery Storage In Eskom.pdf0.90-23548-1-7 WORKSHOP and STORES DIRTY STORM WATER LONG SEC.tif240-56355728 Human Machine Interface Design Requirements Standard.pdf203-1239 Architectural Design Spec R2 final.pdf240-55864504 Belt Conveyor Structural Steelwork and Welding Specification.pdf366-207469 Kusile Conceptual Architectural Design Specification for Structures and Other Buildings.pdfC1 3 ECC3 Proforma Guarantees.pdf240-71432150 - KKS Plant Labelling and Equipment Descriptions Standard.pdfBravo 9.pdfGeneration Plant Safety Regulations.pdf0.90-23540-1-8 WORKSHOP and STORES CLEAN SW LAYOUT.pdfBravo 18.pdf240-73198286 Electrical Plant CoE Operational Plan Work Instruction.pdfBravo 26.pdf240-150475305 Rev 3 Defect Management Work Instruction.pdf240-131806419 Excavating and Trenches work instruction.pdf240-56176852 Essential Power Supplies for Power Stations.pdfLandpac.pdf0.90-24713 Filling Station_ Plan Lighting _ small Power _ Lightining Protection Layout.pdf240-56361454 Under-voltage Protection Standard.pdf240-56227516 LV Switchgear Control Gear Assembly Associated Equipment for.pdf203-13626 Rev4 150310 Trench Excavation Procedure.pdfOHS Specification for fuel station.pdf
Source: the eTenders Portal. Search for tender number E3526GXMPKUS there for the buyer's contact person and any addenda.