Design and Installation of Carbon Online Cegrit Sampler at Lethabo Power Station for a Period of Two (02) Years.
No compulsory briefing is listed for this tender.
For your business
Requirements from the documents
Read automatically from 380 pages. Each item shows where it came from. Items that couldn't be confirmed word for word are left out.
Beta Requirements are read automatically. In our weekly checks on fresh tenders, about 2 to 3 in every 100 confident answers were wrong, so every answer shows the page it came from.
It is estimated that tenderers must have a Construction Industry Development Board (CIDB) contractor grading of 2ME or higher· Invitation to Tender (ITT) Carbon Online_, page 11
- Valid proof of the required CIDB grading designation for the main contractor; JV and /or sub -contractor as may be required in the tender data at tender closing deadline or within 21 working days from the closing date of submission of tenders if this is agreed with the Employer · Invitation to Tender (ITT) Carbon Online_, page 17
- Mandatory Contractual Requirement CSD Registration (CSD number/CSD Report) · Invitation to Tender (ITT) Carbon Online_, page 17
- Where CIDB is applicable; proof of registration on CIDB is mandatory at tender closing deadline. Should this not be received as stipulated in the enquiry; the tender will be disqualified. · Tender Pack/Eskom_Standard_Conditions_of_T…, page 5
- A tender that does not contain the mandatory documents or information stipulated in the Invitation to Tender by the required deadlines will be disqualified from further evaluation. · Tender Pack/Eskom_General_Conditions_of_Pu…, page 8
- A tender’s failure to meet an Enquiry’s stipulated requirement for designated materials will result in its disqualification from further evaluation. · Tender Pack/Eskom_General_Conditions_of_Pu…, page 8
- Determine before detailed evaluation, whether each tender received meets the basic compliance requirements stated in the Enquiry. A tenderer’s failure to comply with the basic compliance requirements will render the tender non-responsive. · Tender Pack/Eskom_General_Conditions_of_Pu…, page 8
- The tenderer must submit the returnable set out hereunder as part of its tender at the stipulated deadline. NOTE THE FOLLOWING: - * Returnables required at Tender closing (disqualifiable): - These returnables are required to be completed, signed (if required on the returnable) and submitted with the · Invitation to Tender (ITT) Carbon Online_, page 14
- If functionality is a criterion, tenderers will be scored against the functionality criteria and will be required meet the minimum threshold stated in the Tender Data to proceed to further evaluation. · Tender Pack/Eskom_General_Conditions_of_Pu…, page 8
Key dates
- Closes
- Wednesday 21 October 2026, 10:00 ()
- Briefing
- Optional, 9 October 2026, 09:00
- Published
- 21 September 2026
- Bid valid for
- 90 days
- Submission
- As set out in the tender document
- Tender number
- E3556GXGPLET
Special conditions
Good Morning Valued Suppliers Due to unforeseen circumstances, we regret to inform you that the non-compulsory clarification meeting has been rescheduled. The meeting will now take place on Friday, 09 October 2026 at 09:00 AM. Eskom Lethabo Power Station would like to extend its deepest apologies for any inconvenience caused by this change and appreciate your understanding and cooperation. Tenders are to be submitted electronically via Eskom Etendering site by the stipulated closing date and time. Tenders are uploaded via Eskom Tender bulletin site on the Eskom Etendering page Please note it is the responsibility of the supplier to ensure that the tender submission is submitted before the closing time
Official documents
Source: the eTenders Portal. Search for tender number E3556GXGPLET there for the buyer's contact person and any addenda.
This page is a summary to help you decide whether to bid. It is not the tender document. Before you submit, read the official documents in full: they always take precedence over this summary.